Loring Greenway Association
Loring Greenway Association
  • Home
  • About Us
    • History
    • Board Meeting Minutes
  • Volunteer
  • Give
    • Give
    • Give for Healthy Trees
    • Annual Reports
  • News
    • Articles
    • Playground Removal
    • Playground Build: Week 1
    • Playground Build: Week 2
    • Playground Build: Week 3
    • Playground Surface One
    • Playground Surface Two
    • Fences Down!
    • Newsletters
  • Contact Us
  • More
    • Home
    • About Us
      • History
      • Board Meeting Minutes
    • Volunteer
    • Give
      • Give
      • Give for Healthy Trees
      • Annual Reports
    • News
      • Articles
      • Playground Removal
      • Playground Build: Week 1
      • Playground Build: Week 2
      • Playground Build: Week 3
      • Playground Surface One
      • Playground Surface Two
      • Fences Down!
      • Newsletters
    • Contact Us
  • Home
  • About Us
    • History
    • Board Meeting Minutes
  • Volunteer
  • Give
    • Give
    • Give for Healthy Trees
    • Annual Reports
  • News
    • Articles
    • Playground Removal
    • Playground Build: Week 1
    • Playground Build: Week 2
    • Playground Build: Week 3
    • Playground Surface One
    • Playground Surface Two
    • Fences Down!
    • Newsletters
  • Contact Us

Playground / Removal / Build: Week 1 / Build: Week 2 / Build: Week 3 / Surface One / Surface Two / Fences Down!

Playground Construction: Week Two

Large Vacuum Truck Solves Excavation Problem

Much of the week was spent determining how to excavate dirt without harming utility pipes under the playground. After extensive talks between city utilities and the contractor, a large vacuum truck was tapped for the job.  The week ended with the installation of the largest playground equipment. 