Playground / Removal / Build: Week 1 / Build: Week 2 / Build: Week 3 / Surface One / Surface Two
1/4
Spaces surrounding the rubber path were filled with manufactured wood chips on October 22 and 23. The wood chips were delivered to the playground through a tube connected to moving van sized truck parked in the One Ten Grant driveway. The tube extended up the south Greenway sidewalk to the playground. Wood chips were distributed on the playground through a sprayer and the end of the tube.